Waitsfield Town logo


Home

About Waitsfield

Area Attractions
& Things to Do


Boards, Commissions,
& Committees


Depts. &
Services

  • Administration
  • Assessor
  • Clerk/Treasurer
  • Dog Warden
  • E-911 Addressing
  • Fire Dept.
  • Fire Warden.
  • Planning &
    Zoning
  • Road Dept.

    Document
    Library


    Links

    News &
    Announcements


    Rules, Regs,
    & Permits


    Works In
    & Progress


    Google Custom Search

    Search the site...






    Not available for PDF &
    Microsoft Office Documents


    Find us on Facebook!
     
    Waitsfield Municipal Water &
        Wastewater Projects
    Works in Progress

    WaterWastewater WSTFTimelineDocumentsFAQsContacts
    Links to documents and off-site pages will open in a separate window.

    For the past 20 years, the Town of Waitsfield had been exploring the feasibility of providing municipal water and wastewater infrastructure to support economic growth in Irasville and Waitsfield Village, avoid sprawl into the rural landscape, protect water quality of the Mad River, and address a number of public health concerns regarding conflicts with private on-site water supply and septic disposal systems.

    After 10 years of intensive planning, testing, and engineering, and in an effort to coordinate the construction with the long-awaited sidewalk project and Route 100 repaving, both projects were presented to voters on March 4, 2008 in the form of three bond articles.  They were defeated.  A post-bond vote task force was formed, which recommended to the Selectboard that the wastewater project be put on hold and that a modified water proposal be brought back to voters.  This bond vote was held June 10, 2008 and was again defeated.  A citizen petition
    (5 pgs, 240 KB) with the required number of signatures (at least 5% of registered voters) was submitted following the defeat of the June 10 bond vote for a water system.  By statute, the Selectboard was required to accept the petition and to schedule a revote within 60 days on exactly the same article as previously voted.  The Selectboard scheduled this revote for September 9, to coincide with the State primary vote on that date, but a defect in the notice process required it to be held on November 4, where it passed 595 to 558.

    Municipal Water Supply
    Current information about the proposed water project can be found at www.waitsfieldvt.us/water.  

    Information about the previous proposals can be found at:
    March 4, 2008 Town Meeting Bond Vote and
    June 10, 2008 Special Meeting Bond Vote.
    Details of the original water project were published in Bulletin #1 in November 2007, mailed to property owners and voters, and posted on-line.


    Municipal Wastewater System
    With the defeat of the March 4, 2008 bond articles and, based upon the recommendation of the post-bond vote task force, further planning for the wastewater system has been suspended. Current information about the wastewater project can be found at www.waitsfieldvt.us/sewer
    .

    Information about the original proposal can be found at www.waitsfieldvt.us/sewer/index_march08.cfm.  Details of the original wastewater project were published in Bulletin #2 in January 2008, mailed to property owners and voters, and posted on-line.

    Links (Documents and outside links will open in a separate window)
    Town Documents
  • Waitsfield Town Plan
    Publications
  • VLCT 2006 Municipal Water & Sewer Rate Information (24 pgs, 280 KB)
    Contact
    Valerie J. Capels, Town Administrator
    Waitsfield Town Office
    9 Bridge Street
    Waitsfield, VT 05673
    Phone: (802) 496-2218
    Fax: (802) 496-9284
    E-mail: town admin e-mail address
     

    Updated October 8, 2009
    Waitsfield's Official Web Site

    Disclaimer
     Although the Town of Waitsfield strives for high quality, accuracy, and completeness in the content on its Web site, it does not warrant or make any guarantees as to the quality, content, accuracy, or completeness of the information, text, graphics, links, and other items associated with this site. Also, the Town will not be liable or responsible for damages of any kind arising from the use of online agendas, minutes, or other information offered on this Web site.   Please be aware that some documents, such as agendas and minutes, are subject to change after they have been posted. Official copies of municipal documents may be obtained from the Waitsfield Town Office, 9 Bridge Street, Waitsfield, VT 05673.
    Please send comments to: webmeister@waitsfieldvt.us
    Hosted by http://www.networksolutions.com
    Copyright © Town of Waitsfield, Vermont.